![codekit old revisions codekit old revisions](https://i.ytimg.com/vi/fRdsCBNPcGY/maxresdefault.jpg)
Step 1: Create change number( Tcode CC01) – Select the profile created PP000001 as displayed below. Change BOM(CS02) and Routing with new revision level (CA02).Create new change number with different validity date (CC01) and assign to material with new revision level (CC11).Create BOM (CS01) and Routing (CA01) with revision level.Assign change number to Material (CC11) with initial revision level.Steps followed for creating and changing the master data: While creating the routing revision level field should be mandatory.
#Codekit old revisions code
OP5A: PP task lists: initial screen -> Change number -> Transaction code -> Tick Req Mapped drawing number as material number and alteration index as revision level.ĭefine Revision Levels (OS55) – Revision levels defined as required.ĭefine Modification Parameters for BOM (OS27) This change can happen during planning or while executing the production.Finally at the end of the day, report is required to see the history of changes.Įngineering Change Management(ECM) is used to track and control all the changes with reference to Material master, BOM, Work Center & Routing. Another challenge is there will be changes for the intial design where in the alteration index will be changed from ‘a’ to ‘b’ or ‘b’ to ‘c’ etc. Even quality department tracks the inspection with respective to drawing number and its alternation index. Planning department identifies, defines structure, executes product manuafcturing based on the drawing and its aleration index. Design department who owns the ownership for product designs creates design drawing and sends to planning department with some alteration index like ‘a’ or ‘A’ etc. In a public sector client, there was requirement to map the drawing number and its alteration index in SAP PP process. It gives an insight on how master data is tracked with different revision levels. This Blog details the usage of revision levels for creation and change of PP masters like BOM and Routing.